Grid & micro data centres

Power, connectivity and compute. Planned as one system.

Forest Grove coordinates the grid, power, technical and delivery interfaces behind resilient infrastructure—from DNO and IDNO strategy through micro AI data-centre commissioning and operation.

DNO / IDNOCONNECTION INTERFACES
SubstationsPROGRAMME & APPROVAL CONTROL
Micro AIDATA-CENTRE INFRASTRUCTURE
Hybrid powerSOLAR · BESS · COMPUTE
Integrated infrastructure delivery

Control the interfaces before they control the programme.

Grid, electrical, civil, network and compute packages move on different technical and commercial timelines. Forest Grove creates the common governance, programme and evidence system around them.

01

Grid strategy

Connection requirements, capacity, milestones, risk, DNO and IDNO responsibilities and the actions required to protect the programme.

02

Substation interfaces

Scope boundaries, contestable works, approvals, dependencies, technical submissions and programme coordination across specialist parties.

03

Power architecture

Resilience, redundancy, load strategy, storage and generation interfaces, operating requirements and phased capacity.

04

Micro AI data centres

Site feasibility, power and cooling requirements, modular deployment, network interfaces, procurement and delivery integration.

05

Hybrid solar & BESS

Integrated energy strategy, controls, connection interfaces and coordinated delivery for generation, storage and compute demand.

06

Commissioning & readiness

Test governance, interface proving, acceptance evidence, operational documentation, training and controlled handover.

Forest Grove manages the client-side programme and technical interfaces. Regulated, contestable and specialist electrical installation works are delivered by appropriately accredited contractors.
What we coordinate

One programme across every dependency.

We establish who owns each decision, when the evidence is due and how every package connects to commissioning and operation.

  • DNO, IDNO and ICP interfaces
  • Grid connection milestones and approvals
  • Substation and contestable-works coordination
  • Engineering and design management
  • Civils, electrical and network interfaces
  • Micro data-centre deployment planning
  • Hybrid solar and BESS integration
  • Procurement and contractor coordination
  • Commissioning and acceptance evidence
  • Operational readiness and performance controls

Bring the load, the grid position and the target date.

We will map the interfaces, delivery risks and route from concept through reliable operation.